Eurospec DSB8225LCP Security Door Bolt Long (LEAD TIME: 2-3 DAYS)

£33.09

INC VAT
In Stock Available for immediate dispatch

In stock

Lowest Price
Guarantee
Fast UK
Delivery
Secure
Checkout
Trade Discounts
Available
BULK PRICING (The more you buy, the more you save!)
QuantityPrice (INC VAT)You Save
1 – 10–
21 – 50
51+
We accept:

Description

This item is on a direct delivery and will be delivered separately. They may also be subjected to longer lead times and cannot be amended, returned or cancelled once ordered.

Eurospec DSB8225LCP Security Door Bolt Long

Contract Door Security Bolt, (Long version) sometimes called a Rack Bolt. The bolt is morticed inside the door edge and can be locked or unlocked via a separate splined key or with a fixed splined turn. The bolt has an internal sawtooth rack mechanism int

Additional information

finish

Polished Chrome

brand

carlisle-brass

Reviews

There are no reviews yet.

Be the first to review “Eurospec DSB8225LCP Security Door Bolt Long (LEAD TIME: 2-3 DAYS)”

Your email address will not be published. Required fields are marked *